Site survey and coordination with the main contractor and Selfridges management.
Manufacture, supply, and installation of temporary hoarding to segregate the construction area from the live retail environment. Installation of the hoarding structure in accordance with the approved design and site requirements.
Supply and installation of printed hoarding graphics to the external face of the hoarding.
Adjustment and finishing of hoarding interfaces to ensure a clean and professional appearance.
Protection of adjacent finishes during installation works.
Removal of all installation waste and site clearance upon completion.
Handover of completed hoarding ready for the commencement of the store refurbishment works.
Preliminaries
Site setup, welfare and management. Waste removal and skips.
Site protection to existing finishes.
Out-of-hours working arrangements.
Site supervision, health & safety compliance, and project management.
Temporary works and logistics for the duration of the programme.
Demolition & Alterations
Removal of existing timber flooring.
Dismantling and disposal of existing furniture, seating, waiter stations and bar features.
Removal of suspended signage.
Removal of wall cladding, mirrors and associated structures.
Complete strip-out of the concession area ready for refurbishment.
Value: £TBC
Client: Selfridges
Location: London
Completion Date: 2026
Ceilings
New suspended plasterboard ceiling systems.
New bulkheads and ceiling features.
Ceiling openings for lighting, MEP services and access panels.
Skim coating and finishing works.
Suspended tile ceilings within stockroom areas.
Internal Walls
Formation of new partition walls.
Plasterboard linings and wall build-ups.
Fire-rated and acoustic wall constructions where required.
Making good to existing structures.
Internal Doors
Supply and installation of new doorsets.
Ironmongery and associated fittings.
Adjustments and finishing works.
Wall Finishes
Preparation of wall surfaces.
Decoration and specialist finishes.
Feature wall treatments and associated trims.
Making good and final finishing.
Floor Finishes
Floor preparation works.
Install ply subfloor to achieve the required buildup
Installation of new floor finishes.
Associated trims and transitions.
Ceiling Finishes
Preparation and decoration of ceilings.
Finishing and making good works.
Specialist ceiling coatings where specified.
Builders’ Work in Connection (BWIC)
Formation of openings and penetrations.
Fire stopping works.
Builders’ work associated with M&E installations.
Making good after service installations.
Miscellaneous Works
Minor ancillary construction items.
General making good and completion works.
Mechanical Works
Modifications and alterations to existing
HVAC systems.
Mechanical services associated with the new layout.